Wednesday 6 July 2011

Time for Design Ideas

Attached is the finalised idea of what we want to do!

Hack everything and rewire entire house.

Level up Balcony.
Change windows at Balcony.
Feature Wall at Living Room.
Build new Storeroom at Living Room. (Box up old main door)

Hack away old storeroom wall at MBR and seal up old storeroom door.
Build partition wall at MBR with relocate toilet door.
Build Wardobe and dresser at MBR

Have glass sliding door for both storeroom and kitchen
Build kitchen cabinets


No comments:

Post a Comment