Thursday 29 September 2011

Speed Work 2

Speedy Work gives excitment in seeing the house take shape

Thurs afternoon.
Kok called to say that the electrician found lots of broken lamps and shattered glass. Gosh.... was so upset that I had almost wanted to take leave. But I had calmed myself down saying we'll see what happened when we meet in the evening. We had checked all lights and I even played with the lights by wiring them up to see the effect in my room... and they were definitely in good condition when we had placed them in the house about 1 month ago... Maybe we had placed them there too early? Maybe the workers damaged them? Or did the glass shatter by themselves? Doubts and questions just keep popping up.

Thurs evening
The planned meeting of Sun Hup and their "heads" of plumbing and electrician. Met them and surprisingly, it's a short session. Had thought will be long and dreadful. But it's manageable.

The moment I stepped into the place, the plumber & electrician immediately catches me and ask me to confirm the locations and installations... luckily I had been prepared well.  =)

Had earlier prepared plans of where the toilet accessories and lights position.

1/2 of the lights are already up in place.

The cove lights and downlights are on but the switches still not yet connected.

The feature wall is up, only the drawers not completed. I can see the speakers connections and also the open net trunking prepared as well.

The broken lights...

Didn't take pictures of those lights that had been damaged. Those are the 2 common bedroom lights. Identical 4 glass holders on each lamp. Hence 2 lamps which are damaged. Had been surprised to see them shattered and also the plastic plugs for the lamp holders shattered as well. How can they be shattered when it was looking so nice earlier on??

I didn't want to point fingers... One of the electrician asked me if the lights were okie when I placed them there... I said yes... Then his partner came beside us and said, "Yah. last time I open before 1 box, the lamp was alright and not broken..."

Decided to move forward and not waste any more time and money. Luckily we had another ceiling lamp which was an extra... didn't place it anywhere and hence it'll go into 1 of the common room. Then I told the electricians to combine all remaining parts of the 2 broken lamps into 1 lamp. Should have enough good parts from what I see. Then it'll fulfil the remaining room. It's just too bad the common rooms are not having the same lights. Electrician then reply," okie. we'll try and see how to combine them." End of broken lights story... better not to dwell too much. Already stressful enough.

After telling the plumber the positions of the accessories, then Kok started to make suggestions on how to improve things... eg. Kitchen sliding door, he will remove his earlier work and also do a boxup with laminate for the sliding mechanism. He's really experienced but still, he's super busy..... to be able to grab more of his time is good.

Enough of words.... let's see some pics!

Wardrobe Carpentry in MBR

Living Room War Zone (Perlyn in Blue)

Agile in the Kitchen. Good Quality Wood... =P